|
|
#1 |
|
Guest
Posts: n/a
|
Tactics for under 11min(3-4ppl)
-split teams into robot:2 and cable:2
Phase 1 -cable team --both bring welder --find fastest line using cost function(red:4 orange:2 yellow :2 disconnected calble:3) --both repair same cable -robot team --both use repair robot --repair yellow and orange one --set priority to low fix rate building.concretely, (0% 100%)isn't good.0% one cause bottleneck.(50% 50%) to (100% 100%) is preferbly --add memo about red parts Phase 2 cable team fixed one line robot team fixed all except red parts -cable team --decide next line using cost function -robot team --one use arm robot and pickup repaired parts --other bring replace parts(red parts) in front of arm robot Taht's all. ToDo: -tactics for under 10min -our bottleneck was fixing red solar panel(it takes 4min) so we planning bring new solar panel with big car. -better cost function -assigning when 5-6 map. maybe cable:4 robot:2 is good -make chart -measure time to each task -number of line vs efficiency -replace vs fix(with human error) vs fix(fastest) |
|
|
||||||
| Thread Tools | |
| Display Modes | |
|
|